Hi,
I have a "Production" TrueNAS CORE 13.0-U3.1 with a Degraded pool of 6x3TB, no more SATA ports are available on the MB. I want to replace the pool with a 2x12TB mirror pool and also switch to SCALE.
I also just setup a "Backup" server with 2x10TB mirror pool and installed SCALE on it. I want to have both systems online with "Production" backing up to "Backup".
My plan is:
I don't remember the details but I failed to do something similar a while back. Also during testing I replicated a dataset to "Backup" and I couldn't replicate the changes to it again. Forgive me I don't remember the details/errors.
Any advise is appreciated. Thanks.
I have a "Production" TrueNAS CORE 13.0-U3.1 with a Degraded pool of 6x3TB, no more SATA ports are available on the MB. I want to replace the pool with a 2x12TB mirror pool and also switch to SCALE.
I also just setup a "Backup" server with 2x10TB mirror pool and installed SCALE on it. I want to have both systems online with "Production" backing up to "Backup".
My plan is:
- From "Backup", which is online now, pull the datasets from the degraded "Production" pool and verify the data (Not sure how to verify yet)
- Replace the disks in "Production" and install SCALE
- From the new "Production", pull the datasets from "Backup" and verify
- Setup periodic replications in "Production" to backup the datasets changes back to "Backup" incrementing of the existing datasets.
I don't remember the details but I failed to do something similar a while back. Also during testing I replicated a dataset to "Backup" and I couldn't replicate the changes to it again. Forgive me I don't remember the details/errors.
Any advise is appreciated. Thanks.